In 2015 Eminent Engineering won a metalwork package for the £21m development of the Ashington Leisure Centre which was led by Arch, the Northumberland Development Company and funded by Northumberland County Council and Sport England. Included in the development is two new swimming pools, state of the art gym facilities, multifunctional sports halls and studios, a spa and a library. Ashington’s leisure centre development is just one aspect of the renewal of Ashington Town Centre which has been set out by Arch and aims to make institutions in Ashington more sustainable and hopes to attract more investments. The contract awarded to Eminent Engineering included several metalwork and fabrication elements including two specialist staircases and glass balustrades in highly visual areas and terraces to the swimming pools.
In January this year the Ashington Leisure Centre officially opened its doors to the public for the first time and has been a roaring success. Andy Laidler has said “We are delighted at the response of people to the opening of the centre and it’s wonderful to see the smiles on everyone’s faces.
ASHINGTON LEISURE CENTRE


